Monday, December 9, 2013

Week 8-10 - Finishing Construction and Unwrapping

Week 8 - Adding the Final Details
This week I had to continue with the final details, mainly the doors and windows. I sketched out some designs for the windows and doors and then modeled each one out. I then duplicated and moved each one around the house. Some front stairs were added as well as back stairs.




The only thing that didn't get done were the two double doors and the windows for the towers. I also didn't like the way the decorative windows looked for the two decor pieces of the roof.

Week 9 - Finishing the House and Starting to Unwrap.
For this week I just had to finish the house. I made the double doors for the top floor, the front doors, and the tower windows. I also redid the decorative windows. 
After that I deleted all duplicate objects and deleted the history from everything to try and clean up the scene, then started unwrapping. I did the first floor, the bottom balcony and the front stairs.




Week 10 - Unwrapping the House
So this past week I spent unwrapping the house. I did the rest of the house itself but didn't do the the details. So the doors, windows, railings, and chimneys still have to be unwrapped. I manged to the scale everything evenly except for the main part of the roof which needs to be bigger. Otherwise its coming along.






And thats it for the class.